Low Cost Mobile Public Toilet Wholesale Portable Chemical Shower Toilet Plastic Outdoor Toilet for Park

Customization: Available
Material: Sandwich Panel
Type: Detachable House

Product Description

Basic Specifications

Fire Proof
A1 Grade Fire Proof
Wind Pressure
Anti 100km/H
Earthquake Grade
7 Fission Activate
Temperature Range
-25 to 50℃
MOQ
1 Sets
Delivery Detail
7-10 Days
Certification
ISO, CE
Specification
6055*2438*2896mm
Transport Package
Flat Pack
Production Capacity
50000 Units

Product Gallery & Details

Product Advantages

Feature Description
Flexible Combination Units can be used single or combined creatively, up to 3 layers for space expansion.
Simple & Stylish Various interior and exterior decoration materials available with standardized accessories.
Fast Installation Average installation time of 3 hours by 4 workers; easy to move and dismount.
Solid Structure Lifespan over 15 years. Resistant to Grade 7 earthquakes and Grade 9 winds.
Wide Application Ideal for hotels, apartments, offices, schools, housing projects, and military camps.

Packaging & Transportation

Package Size: 600.00cm * 300.00cm * 290.00cm | Gross Weight: 2000.00kg

Efficiency 4 units compressed into 1 package equals a standard 20'GP container. 1 40'HQ can load 6 units.
Methods Choice of whole container or flat compression transport based on distance and site convenience.

Frequently Asked Questions

Are you a factory or trading company?
We are a factory located in the leading modular building production base in China.
Why is the price competitive compared to other suppliers?
As a direct manufacturer, we produce several grades of products to meet different budget requirements while ensuring high quality across all price points.
What is your monthly supply capacity?
Our capacity includes 600,000 square meters of prefab houses per year and 500 sets of containers per month.
How can the product quality be verified?
We provide samples, formal product certification reports, and have numerous long-term global partners as references.
What is the standard delivery lead time?
Generally, goods can be delivered within 10 to 15 days following the receipt of the prepayment or original B/L.
Can the units be customized?
Yes, the units are fully customizable in terms of size, materials, and internal configuration to meet specific project needs.

Related Products